City Of Cedar Rapids: Cedar Rapids HCW7 – Caisson & Laterals
Cedar Rapids, Iowa
Cedar Rapids, Iowa
This project included construction of the caisson and laterals for Horizontal Collector Well 7 along the Sinclair Levee in Cedar Rapids, Iowa. The project featured a 20-foot inside diameter by 24-foot outside diameter reinforced concrete caisson extending 75 feet in length, along with approximately 1,200 linear feet of 12-inch-diameter stainless steel laterals. The laterals were distributed across six lines to support the City’s groundwater collection system.
Contract Amount:
$4,032,200
Notice to Proceed:
December 1, 2023
Completion Date:
April 4, 2025
MGD: 6.48
Owner:
City of Cedar Rapids
Dave Stender, Contracts Admin.
(319) 286-5504
d.stender@cedar-rapids.org
Engineer:
Black & Veatch
Barry Schmidt, Civil Engineer
(913) 458-3660
schmidtbt@bv.com