City Of Huntingburg: Huntingburg Wastewater Utility Improvements – Division A WWTP

Huntingburg, Indiana

Project Description

This project involves the construction of a new 3.45 MGD Wastewater Treatment Plant (WWTP) with key components including a new headworks and screening system, a Sequencing Batch Reactor (SBR) system, a UV disinfection system, a cascade aeration system, and new chemical and electrical buildings.

Additional improvements include the installation of a bag dewatering system, an emergency generator, a sludge bed roof, and a non-potable water system. The project also features the construction of a new effluent sewer and outfall. The scope of work includes nearly 8,000 cubic yards of concrete placement and the implementation of rigid inclusion ground improvements to enhance structural stability. Reynolds is self-performing the cast-in-place concrete work.

At A Glance

Contract Amount:
$37,198,561

Notice to Proceed:
July 28, 2024

Est. Completion Date:
December 30, 2026

MGD: 3.45

Owner:
City of Huntingburg
Brad Coomer, WWTP Supt.
Office: (812) 683-3203
Cell: (812) 661-7261

Engineer:
Commonwealth Engineers, Inc.
Eric Parsley, P.E.; (812) 453-6064