West Lift Station & Force Main
Plainfield, Indiana
Plainfield, Indiana
The project included construction of a new sewer lift station, installation of 27-inch and 18-inch PVC gravity sewers, a 10-inch HDPE force main, and a 20-inch HDPE force main for future use. Work also included decommissioning an existing lift station and converting it to a gravity manhole. These improvements enhanced wastewater collection capacity to support the rapidly growing industrial area on the southwest side of Indianapolis. Reynolds Construction self-performed all open-cut pipe and manhole installations, precast concrete wet well and valve vault installations, and interior piping.
Contract Amount:
$7,527,834
Notice to Proceed:
December 19, 2024
Completion Date:
August 5, 2026
Owner:
Town of Plainfield
Engineer:
Whitaker Engineering
If we seem a little unique for a construction company, we’ll take it as a compliment. We’d love to talk about what it be like to work together, the way we both want to.