City Of Bloomington – Dillman Road

Bloomington, Indiana

Project Description

This improvements/expansion project to the existing wastewater treatment plant involved:

  • Replacement of all RAS/WAS piping and plumbing
  • New disc filter building, and all associated piping
  • New Flygt RAS/WAS and Scum pumps
  • New Aerzen Positive displacement blowers Added 5 of these)
  • New Atlas Copco centrifugal blowers (added 4 of these)
  • Converted 3 equipment rooms to electrical rooms (electrical system for the whole plant was revised and changed from 4160 volt to 480 volt)
  • New Flygt RAS/WAS and scum pumps. (plant is a mirror image so this work was done on both ends of the plant)
  • New building to house a new Kruger Disc filter. Filter was built in Sweden and shipped here, 10mgd capacity
  • Job added 207 new valves, 27 pumps from 4” to 18”. Several thousand linear feet of steel and ductile iron piping

At A Glance

Contract Amount:
$23,940,971.54

Notice to Proceed:
April 15, 2020

Completion Date:
July 9, 2024

MGD: 15

Owner:
City of Bloomington
Garrett Towell
(812) 824-4900 ext 101
towellg@bloomington.in.gov

Engineer:
Greeley & Hansen
Brian Bland, P.E.
O:(317) 744-2887; C:(317) 879-6504
Brian.bland@tylin.com