High Zone Water Tank
Douglas County, Colorado
Douglas County, Colorado
This project involved improvements to the potable water distribution system through the design and construction of a 2.0-million-gallon buried, prestressed concrete water storage tank. The tank was supported by a cast-in-place concrete slab on compacted granular fill. Additional work included site excavation, installation of new buried piping, valving, piping connections, electrical power and control systems, and site grading.
Reynolds also provided and installed water distribution piping to the connection point within the tank manufacturer’s limits and installed adjoining piping to connect to the Eastern Regional Pipeline. This work included a 24-inch ductile iron pipe outlet, a 30-inch steel pipe inlet, and a 24-inch ductile iron bypass with valving.
Contract Amount:
$5.6M
Notice to Proceed:
October 1, 2019
Completion Date:
October 16, 2023
Owner:
Dominion Water & Sanitation District
Engineer:
Black & Veatch
If we seem a little unique for a construction company, we’ll take it as a compliment. We’d love to talk about what it be like to work together, the way we both want to.