Liberty Utilities Dykeer Station GAC
Somers, New York
Somers, New York
This project expanded the water treatment facility’s treatment capabilities through modifications to the existing process piping and construction of a new granular activated carbon (GAC) treatment building. Reynolds removed a portion of the existing concrete floor slab, installed new process piping and a GAC backwash pump within the existing water treatment building, and installed new yard piping connecting the existing and new buildings.
The new GAC building houses a treatment system consisting of two skids, each equipped with four GAC pressure vessels. The project also included installation of new HVAC equipment, including an exhaust fan and electric unit heater, within the new building.
Contract Amount:
$1,232,797
Notice to Proceed:
July 26, 2021
Completion Date:
May 31, 2023
MGD: 0.43
Owner:
Liberty Utilities
Engineer:
Hazen and Sawyer
If we seem a little unique for a construction company, we’ll take it as a compliment. We’d love to talk about what it be like to work together, the way we both want to.