Cobb County Water System Galleria Area Outfall Sewer Replacement

Atlanta, GA

Project Description

This project was a sewer replacement for Cobb County. It included 500lf of 84” tunnel with shafts, 600’ of open cut ductile pipe -30”, 1,400’ of 18 FPVC installed inside of a 7’x7’ box culvert, as well as a bypass system to carry all of the sewer during construction.

At A Glance

Contract Amount:
$9,325,441

Notice to Proceed:
February 16, 2023

Completion Date:
February 13, 2025

Owner:
Cobb County

Engineer:
Cobb County