Key Largo Wastewater District – Key Largo Wastewater Treatment Plant
Key Largo, Florida
Key Largo, Florida
The Key Largo Water Treatment District performed capital upgrades on three of the WWTP’s systems. These included the headworks, the process water pumping system, the walkway bridge between SBR #3, and the third-floor balcony of the operations building.
Headworks Bypass Piping and Repairs: This portion of the project included installation of 18” bypass piping and associated fittings.
Plant Process Water Pumping System Upgrade: This portion of the project included replacement of the existing pump and hydro-pneumatic tanks with a variable-speed pumping system and replacement of approximately 250’ of existing 2” non-potable PVC underground water piping with 4” PVC.
Walkway Bridge: This part of the project included providing and installing an aluminum walkway bridge with grating, handrails and a kickplate between SBR #3, and the 3rd-floor balcony of the operations building.
Contract Amount:
$1,115,956
Notice to Proceed:
July 16, 2018
Completion Date:
May 31, 2019
Owner:
Key Largo Wastewater District
Laura Weinstock (305) 451-4019
laura.weinstock@klwtd.com
Engineer:
Weiler Engineering
Ed Castle
(305) 289-4163
edrcastle@me.com