Georgia Pacific Riverbank Stabilization
Cedar Springs, Georgia
Cedar Springs, Georgia
This project included marine construction services along approximately 400 linear feet of riverbank on the Chattahoochee River. Reynolds cleared and grubbed the riverbank, removed unsuitable soil, and replaced it with suitable, compacted fill. The riverbank was graded to a 2H:1V slope and stabilized with filter fabric and riprap. Riprap was installed across the entire slope, with thicknesses ranging from 3 feet at the base to 1 foot at the top.
Contract Amount:
$1,684,937
Notice to Proceed:
January 1, 2021
Completion Date:
May 12, 2021
Owner Contact Info:
Georgia Pacific
Engineer Contact Info:
LEA